Kitchen Remodeling in Philadelphia, PA | Bottom Side Plumbing
Kitchen Remodeling — Philadelphia, PA

A Kitchen Built Around How You Actually Cook not around where the pipes used to be

Rowhome kitchens are narrow, and the layout you inherited was usually decided by plumbing rather than by anyone who cooks. Because we hold the plumbing license in-house, moving a sink or a gas line is part of the job rather than a reason to compromise the plan.

Kitchen at a Glance
Scope
Layout to final fixtures
Plumbing Moves
Handled in-house
Finishes
Cabinetry, counters, tile
Estimates
Free & itemized

The Layout Is the Whole Project

Everything else in a kitchen remodel — cabinets, counters, tile, appliances — is a decision you can change your mind about. The layout is not. It is set by where water, waste and gas can go, and in a Philadelphia rowhome those runs were installed a century ago with no thought for how anyone would cook.

That is why so many rowhome kitchens have the sink under the only window, the fridge blocking a doorway, and two feet of counter total. The layout was never designed. It was inherited from the plumbing.

We start there. Because our own licensed master plumbers are on the job, relocating a sink, running a new waste line or moving a gas connection is a normal part of the scope rather than a change order that arrives after demolition. Then cabinetry, countertops, tile, flooring and lighting get fitted to the layout you actually want.

Everything Inside the Four Walls

A kitchen touches more trades than any other room in the house. All of these are in-house rather than subcontracted.

Layout and design
Working out what the space can actually support, then designing to that — including moving services where the better layout requires it.
Plumbing and gas
Sink relocation, new waste and supply runs, dishwasher lines and gas connections, done by our own licensed master plumbers.
Cabinetry and countertops
Custom and semi-custom cabinetry fitted to rowhome walls that are rarely square, with countertops templated to the installed boxes.
Tile and backsplash
Wall tile, backsplashes and any tile flooring, set on a properly prepared substrate rather than over whatever was there.
Electrical and lighting
Dedicated circuits for appliances, under-cabinet lighting and enough outlets that you are not sharing one with the toaster.
Drywall, paint and trim
Patching where walls moved, then a finish that does not advertise where the old kitchen ended.

From Measurement to First Meal

A kitchen is the room you cannot live without, so the order of work is built around keeping the disruption as short as it can honestly be.

01
Measure and plan

We measure the room, locate the existing water, waste and gas runs, and work out which layouts are genuinely possible. You get an itemized estimate covering both the finishes and any service relocation.

02
Selections locked before demolition

Cabinetry, counters, tile and appliances chosen and ordered first. Long-lead items are the most common cause of a kitchen sitting half-finished, so they get resolved before anything comes out.

03
Demolition

Old cabinets, counters, flooring and any walls coming out, with dust control and protection for the rest of the house.

04
Plumbing, gas and electrical rough-in

Services moved to suit the new layout, then inspected where the work is permitted, before anything is closed up.

05
Drywall, paint and flooring

Walls closed and finished, then flooring installed before cabinetry goes in so there are no gaps at the toe kick.

06
Cabinetry, counters and fixtures

Cabinets set and levelled, counters templated and installed, then sink, faucet, appliances and lighting connected and tested.

What Having the Plumber In-House Changes

This is the single biggest practical difference between us and a finish-only kitchen contractor.

01

The layout stops being dictated by pipes

If the better plan needs the sink on another wall, that is a task rather than an obstacle. Most rowhome kitchen compromises exist for no other reason.

02

No change order after demolition

Service relocation is priced in the original estimate, not discovered when the walls open and quoted as an extra.

03

One crew, shorter without a kitchen

No waiting for a plumbing sub to fit you in between the demolition and the drywall. That gap is where kitchen timelines usually double.

04

Permitted and inspected properly

Moving gas and waste lines is not cosmetic work. Doing it under permit protects you at resale and on any future insurance claim.

Kitchen Remodeling Questions

Timelines, layout changes, permits, and how long you will actually be without a kitchen.

How long will I be without a kitchen?

Plan for weeks rather than days, and the honest variable is not the construction but the materials. Cabinetry and countertops are made to order, and a kitchen sitting half-finished while a cabinet order arrives is the most common way a timeline doubles. That is why we lock and order selections before demolition rather than during it. Countertops add a fixed wait of their own, because they are templated against the installed cabinets and then fabricated, which cannot be compressed. We will give you a stage-by-stage schedule showing exactly which weeks you have no sink and which weeks are finish work you can live around.

Can you move the sink, or am I stuck with the current layout?

We can move it, and in a rowhome that is often the single change that makes the kitchen work. Relocating a sink means new supply lines and, more importantly, a waste line that reaches the stack at the correct fall — which is the real constraint, not the water supply. Because our own licensed master plumbers are on the job, we can tell you at the estimate stage what the pipes will and will not allow, and price the relocation into the original number. A finish-only contractor usually has to design around the existing plumbing or bring in a sub after demolition and quote it as an extra.

Do I need a permit for a kitchen remodel in Philadelphia?

Cosmetic replacement generally does not, but most real remodels do. Swapping cabinet doors and repainting is one thing; moving plumbing or gas lines, adding electrical circuits, or altering walls is permitted and inspected work. The distinction matters more than it seems, because unpermitted plumbing and gas work can surface during a sale and can complicate an insurance claim if something later fails. We tell you at the estimate which parts of your scope need a permit, then file and schedule the inspections ourselves rather than leaving it to you.

Can you work with cabinets or appliances I have already bought?

Yes, and it is common. Bring us the specifications early rather than after demolition, because appliance dimensions and cabinet sizes drive the layout, the electrical and sometimes the plumbing. Integrated appliances in particular have clearance and connection requirements that are much cheaper to design around than to discover. If something you have bought will not fit the space or will create a problem — a fridge that cannot open fully, a range needing a circuit the house does not have — we would rather flag it at the estimate than install it and let you find out.

Is it worth remodelling a small rowhome kitchen?

Often yes, precisely because small kitchens have the most to gain from a layout change. When a room is large, a bad layout is inefficient; when it is nine feet wide, a bad layout makes the kitchen barely usable, and fixing it can transform how the whole floor functions. The gains usually come from moving one service, borrowing space from an adjacent room or hallway, and choosing storage that suits the proportions rather than scaling down a suburban plan. We will tell you at the assessment whether your kitchen is a layout problem or a finishes problem, because they cost very different amounts.

Let Us Look at the Layout

Send us the room and how you want to use it. We will tell you which layouts the plumbing allows, and give you an itemized estimate at no cost.